mw. dr. M. (Marit) Schoonhoven
-
Faculteit Economie en Bedrijfskunde
Sectie Operations Management
-
Plantage Muidergracht
12
1018 TV Amsterdam
Kamernummer: M0.22
-
M.Schoonhoven@uva.nl
T: 0205255203
Positions
Consultant at
IBIS
UvA
PhD in Industrial Statistics
Research interests
Industrial Statistics, Statistical Process Control
My personal homepage
My personal homepage at the IBIS UvA website
Curriculum Vitae
2015
- R.J.M.M. Does, J. de Mast & M. Schoonhoven (2015). Discussion of “An emerging science of improvement in health care”. Quality Engineering, 27 (1), 35-40. doi: 10.1080/08982112.2015.968044
- I.M. Zwetsloot, M. Schoonhoven & R.J.M.M. Does (in press). A Robust Phase I EWMA Chart for Dispersion. Quality and Reliability Engineering International. doi: 10.1002/qre.1655
- I.M. Zwetsloot, M. Schoonhoven & R.J.M.M. Does (in press). Robust Point Location Estimators for the EWMA Control Chart. Quality Technology and Quantitative Management.
2014
- I.M. Zwetsloot, M. Schoonhoven & R.J.M.M. Does (2014). A robust estimator for location in Phase I based on an EWMA chart. Journal of Quality Technology, 46 (4), 302-316.
- H.Z. Nazir, M. Schoonhoven, M. Riaz & R.J.M.M. Does (2014). Quality quandaries: how to set up a robust Shewart control chart for dispersion? Quality Engineering, 26 (1), 130-136. doi: 10.1080/08982112.2013.848367
- H.Z. Nazir, M. Schoonhoven, M. Riaz & R.J.M.M. Does (2014). Quality quandaries: a stepwise approach for setting up a robust Shewhart location control chart. Quality Engineering, 26 (2), 246-252. doi: 10.1080/08982112.2013.874562
2013
- M. Schoonhoven & R.J.M.M. Does (2013). Response to the letter to the editor concerning articles on robust estimation techniques for SPC. Journal of Quality Technology, 45 (4), 397-398.
- M. Schoonhoven & R.J.M.M. Does (2013). A robust Xbar control chart. Quality and Reliability Engineering International, 29 (7), 951-970. doi: 10.1002/qre.1447[go to publisher's site]
2012
- J. Lokkerbol, R.J.M.M. Does, J. de Mast & M. Schoonhoven (2012). Improving processes in financial service organizations: where to begin? International Journal of Quality and Reliability Management, 29 (9), 981-999. doi: 10.1108/02656711211272881
- M. Schoonhoven & R.J.M.M. Does (2012). A robust standard deviation control chart. Technometrics, 54 (1), 73-82. doi: 10.1080/00401706.2012.648869[go to publisher's site]
2011
- M. Schoonhoven, H.Z. Nazir, M. Riaz & R.J.M.M. Does (2011). Robust location estimators for the X-bar control chart. Journal of Quality Technology, 43 (4), 363-379.[go to publisher's site]
- M. Schoonhoven, M. Riaz & R.J.M.M. Does (2011). Design and analysis of control charts for standard deviation with estimated parameters. Journal of Quality Technology, 43 (4), 307-333.[go to publisher's site]
- M. Schoonhoven, B.P.H. Kemper, M.I. Brilleman & R.J.M.M. Does (2011). Quality quandaries: Streamlining the path to optimal care for cardiovascular patients. Quality Engineering, 23 (4), 388-394. doi: 10.1080/08982112.2011.602169[go to publisher's site]
2010
- M. Schoonhoven & R.J.M.M. Does (2010). The x-bar control chart under non-normality. Quality and Reliability Engineering International, 26 (2), 167-176. doi: 10.1002/qre.1029[go to publisher's site]
2009
- M. Schoonhoven, M. Riaz & R.J.M.M. Does (2009). Design schemes for the X control chart. Quality and Reliability Engineering International, 25 (5), 581-594.
2013
- M. Schoonhoven, C. Lubbers & R.J.M.M. Does (2013). Quality Quandaries: Shortening the throughput time of a hospital’s billing process. Quality Engineering, 25 (2), 188-193. doi: 10.1080/08982112.2012.758287
2012
- M. Schoonhoven (2012). IBIS UvA: Combining theory and practice in the area of quality and efficiency improvement. Aenorm, 20, 17-21.
2011
- M. Schoonhoven (2011, November 16). Estimation methods for statistical process control. Universiteit van Amsterdam (viii, 125 pag.) (Amsterdam: Universiteit van Amsterdam). Supervisor(s): prof.dr. R.J.M.M. Does.
This page has been automatically generated by the UvA-Current Research Information System. If you have any questions about the content of this page, please contact the UBAcoach or the Metis staff of your faculty / institute. To edit your publications login to Personal Metis.
- Geen nevenwerkzaamheden
